Pile head dismantling
Pile load test
Excavation from Pile Top to Cutoff Level
Pile testing 4 & 5 under progress
Excavation upto pile cutoff level
Excavation upto pile cutoff level
Pile Head Dismantling
Pile Head Dismantling
Pile Integrity Test
Pile Head Dismantling (Tower 7)
Concreting For PCC in Tower 7
Preparation for PCC in tower 7
Preparation for PCC in tower 7
PCC work in progress in tower 7
PCC work in progress in tower 7
PCC work in progress in tower 7
PCC work in progress in tower 7
Raft casting completed at tower 7
Bottom Bar laying at Tower6
Concrete(M-30) Cube casting at site for raft T7
Raft casting at Tower 7
Concrete temperature testing at site
Raft Pouring at Tower7
Slump cone test at site
T7 raft bottom reinforcement WIP
T5 raft outer line b/w WIP
T5 raft outer line b/w WIP
T6 waterproofing WIP
Column Reinforcement fixing WIP at Tower 6
Casting of column & shear wall at Tower 7
Workability checking at site
Concrete Temperature checking at site
Cube casting of Concrete at Site
Raft casting at Tower 6
Raft casting preparation at Tower 6
Lift pit excavation between T6 & T5
Bottom baar & bottom extra bar reinforcement laying at Tower 5
Bottom bar reinforcement laying at Tower 5
Layout for mivan shuttering at Tower 7
Basement slab & beam casting completed at Tower 7
Shuttering fixing for slab & beam casting at Tower 6
Shuttering fixing for Basement slab & beam casting at Tower 6
Non Tower area Excavation
2nd pour raft casting completed at Tower 5 & 6
Electrical conducting fixing at Tower 7
Reinforcement laying for basement roof slab fixing at Tower 7
Slab & beam shuttering fixing at Tower 6
1st lift column & shear wall casting at Tower 5
Top reinforcement laying for 2nd pour raft at Tower 7
Shuttering fixing for slab & Beam casting at Tower 7
Basement 1st pour slab casting completed at Tower 6
Basement slab conducting WIP at Tower 5
Mivan shuttering fixing WIP at Tower 7
Mivan shuttering fixing at Tower 7
Basement slab casting WIP at Tower 6
Basement roof slab reinforcement & shuttering WIP at Tower 5
Aluminium shuttering is going on at Tower 7